[1]
Nwaneto, C., Nwaneto, C.P. and Fasasi, S.T. 2024. The Hidden Cost of Scope Ambiguity: Why OFCI vs. CFCI Delineation Breaks Data Center Budgets. SAMRIDDHI : A Journal of Physical Sciences, Engineering and Technology. 16, 04 (Dec. 2024), 214-222. DOI:https://doi.org/10.18090/samriddhi.v16i04.11.